Posts

Some Radio Work for the Ranch

Image
  Some Radio Work for the Ranch by admin on Jun.17, 2009, under Communications We have found that there is a weak cell signal (at least on Verizon and our Nextel phone) at the LittleHouse.  If we go down to Markham Pass at the end of our lane, we can get a pretty good signal (2 – 4 bars) and make calls with ease.  Then if we leave the cellphone on, and hurry back to the LittleHouse site, we don’t have any bars, but can still make calls with acceptable quality. The problem is, if we turn on the cellphone at the LittleHouse, the signal is so weak, that the cellphone never acknowledges that it is there.  I’m thinking that installing an antenna up in the clear near the house has a good chance of providing reliable service there.  So the first step of that project was to build an antenna mast near the house.  And just to complicate things, I decided that it needed to support a rudimentary Ham Radio antenna, as well.  Here is what we...

Memorial Day 2009

Image
  Memorial Day 2009 by admin on Jun.04, 2009, under Seasons We were pretty lucky with weather for this trip.  However, just as we were arriving at Anvil Rock, it started raining.  By the time we got to Markham Pass, the road had turned to butter again.  But we made it through ok. The rest of the week was pretty nice.  It typically clouded up by noon, and kept it cool in the afternoon.  On Friday, we got about a full hour of steady rain.  When it finished, we went outside and enjoyed the nature after the rain.   Peak off to the west from the meadow Some more photos after the rain…   Clearing on south mountain   Stick Bushes got leaves… Usually they are bare…   Stick Bushes A couple of oriels started hanging around the cabin all week.  Here is a pretty good picture of one, but it’s through the screen door, so there is some obstruction. I think it's a Scott's Oriel.   oriel And here is my attempt at bl...

More Electrical Work – Memorial Day 2009

Image
  More Electrical Work – Memorial Day 2009 by admin on Jun.04, 2009, under Electrical We came up for a week over Memorial Day to do more electrical work. We started by installing the bathroom vent fan. Here is the fan installed in the ceiling…     Bathroom Fan mounted in ceiling Later in the week, we got the missing piece that allowed us to install the duct works…   Bathroom Fan with Duct to north wall installed Here are the outlets under the small loft area. The 3-way wiring was all done in the left-most receptacle, then we simply paralleled two more lights to the first…   Ceiling lights below small loft And here is a close-up picture of the 3-way wiring inside the first receptacle…   3-way wiring     And here are more ceiling lights and fan receptacles.   Ceiling Lights and Fan receptacles   Three Way switch wiring   Breaker Box wiring   Front Panel on Breaker Box   Circuit Numbers

LittleHouse Wiring Cont’

Image
  LittleHouse Wiring Cont’ by admin on May.05, 2009, under Electrical After finishing the Bathroom wiring, we started on the Kitchen. We started at the far end of the string, and installed the switchbox first, then started working our way back toward the breaker box from there. One switch for Kitchen Lights, one for Garbage Disposal, two for outdoor lights.   Kitchen Switchbox We finished the South side first.  On this side of the Kitchen we plan to have the sink and possibly a dishwasher, but we haven’t decided on that yet…   Kitchen South Side Next, we moved on the the East Side, where we just plan to have a countertop and the small RV-type hot water heater…   Kitchen East Side And then we moved on to the North side, where we ran out of the 12-2 wire.  So we will have to finish that on the next trip up.  We plan to have the refrigerator and stove and microwave on this side….   Kitchen North Side Finally, we wired up the cei...

LittleHouse Electrical Installation

Image
  LittleHouse Electrical Installation by admin on May.04, 2009, under Electrical We started electrical wiring in the LittleHouse on May 2nd, 2009. Starting in the Bathroom, we were able to get the Bath Wiring finished, and got started on the Kitchen Wiring before we ran out materials.   Bath Switchbox We went to Home Depot to get some electrical supplies before coming out for this trip. While looking for a suitable breaker box, we came across an All-In-One box for $35.00 by Square-D. Since this included five 20-amp breakers, we figured it was a pretty good deal, as the breakers themselves are about $6.00 each…   Panel Box This did not include a main breaker, but we have a trick to get around that. The idea is to use 2 of the breaker positions to actually feed the box from our inverter through a 30-amp dual pole breaker. This will then act as our main breaker, with the rest of the breakers feeding the various circuits. We are also connecting the ...

May Day, 2009 Trip

Image
  May Day, 2009 Trip by admin on May.04, 2009, under Seasons We left Mesa on May Day, 2009 for a quick trip up to the ranch. For this trip, our main project was to touch up the trim paint where it had been peeled off by the masking tape removal. We started out from Mesa at about 09:00 am, and arrived at the Ranch at about 1:00 pm.  The forecast was for rain all Saturday afternoon, so we thought we better get the paint touch up done on Friday.  We were able to finish the painting by about 6:00, and took the rest of the day off. The next day, the rain did not materialize, and we just had a little cooler temperatures (about 65 degrees), and some wind.  In between our other projects, we installed a Game Camera in the meadow.   Game Camera We didn’t capture any photos over the weekend, so we will check it again when we come up at the end of the month. We did however, run into one of the millions of Dung Beetles that we see every year.  I...

Painting the LittleHouse

Image
  Painting the LittleHouse by admin on Apr.21, 2009, under Trim & Paint So finally we got back up to the Ranch on mid April, 2009 to finish the painting of the LittleHouse. Here is how it went…   LittleHouse Paint Job On our previous trip, we had used a sprayer to paint the trim a light green color.  On this trip, we decided to do minimal masking and just roll on the earthtone brown paint for the flat parts.  We thought that would be easier than doing an extensive mask job to spray the brown color.  I still think we were right. So after masking just the edges of the trim that were next to the hardiboard panels, we cut in the brown around the edges, then used a roller to apply the remainder of the paint.  It still took about 6 hours to mask everything, and about 8 hours to do all of the painting.   Cutting in the corners with a brush When it was all done, this is what the south (front) side of the LittleHouse looked like. ...